Preparation of Feasibility Report and Implementation Project of Recovery and Irrigation Transmission Lines for Çiğli Wastewater Treatment Plant (IZSU)
Date: October 2021 -On-Going
Location: Turkey
Work Detail:Design and feasibility study for the reuse of Çiğli Wastewater Treatment Plant discharge water of 220 hm3/year and urban irrigation, agricultural irrigation, and feeding of the Gediz River delta.
The main purpose of the project is to reuse the discharge water of Çiğli WWTP, which has a capacity of 200,000 m3/day, for water saving and effective resource management.
Technical support for the development of the Feasibility Study (FS) of the project “Improvement of the Surkhandarya region’s drinking water supply system by using the Tupolang reservoir waters (JSC Hydroproject)
Date: September 2021-December 2022
Location: Uzbekistan
Work Detail:Providing high-quality drinking water, improving social living conditions, and enhancing the health of the population in Sariasi, Denau, Shurchinsky, Bandykhansky, Kiziriksky, Kumkurgan, Sherabad, Jarkurgan, Angora, Muzrabad, Tezmez districts, and Termez urban centers and rural settlements.
Feasibility study to provide water to the settlements along the existing Tupolangi-Termez water pipeline.
Implementation of a project for a 200,000 m3/day capacity drinking water treatment plant.
Implementation of a 400 km transmission line project.
Çesme Sea Water Treatment Plant Feasibility Report (IZSU)
Date: October 2021-Ongoing
Location: Turkey
Work Detail:
Preparation of Feasibility study of Çeşme desalination plant in order to use sea water as a water supply source.
Main objectives of the Project:
Water supply sustainability,
Utilization of sea water as a water supply source instead of wells,
Lowering the cost of pump stations and the existing system.
Çeşme Desalination Plant WWTP:
1st stage, with horizon 2025 Qdesign = 15,000 m3/day,
2nd stage, with horizon 2055 Qdesign = 35,000 m3/day,
Reverse Osmosis Sea Water Treatment.
Feasibility Study and Detailed Design Work of Konya Province Karapınar and Suğla Locations Water Supply (Konya Metropolitan Municipality Water and Sewage Administration (KOSKİ)
Date: September 2019-December 2020
Location: Turkey
Work Detail:Design the water supply need of Karapınar and Suğla Locations of Konya province.
Design of infrastructure system includes water transmission lines, water reservoirs, and related all details; hydraulic modeling, profiles, washout, and air release valve.
Design Flow Rate: 261 lt/sn
Design Population: 355,043 cap. With horizon of 2055
Total Length of Water Transmission Line: 159,890 m (Ø600 – Ø90)
Water Storage: 2 x 100 m³, 1 x 200 m³
Feasibility Study of Eskişehir (Centrum) Wastewater Treatment Plant (İlbank)
Date: November 2015-April 2016
Location: Turkey
Work Detail:Preparation of a Feasibility Study for Eskişehir Municipality to identify and identify priority legislative compliance and investment needs for the provision of wastewater services using EIB loans managed by Iller Bank.
Eskişehir WWTP has a design capacity of 146,138.49 m3/day for an equivalent population of 1,344,012.
Feasibility Study of Burdur (Centrum) Wastewater Treatment Plant(İlbank)
Date: August 2015-April 2016
Location: Turkey
Work Detail:Feasibility Study for Burdur to identify and define its priority legislative compliance and investment needs for the provision of wastewater services by using EIB loans administrated by İller Bank.
Main objectives of the Project:
Ensuring that the Burdur City achieves compliance with Turkey’s Urban Wastewater Treatment Regulation 26047, as harmonized with EC Directive 91/271/CEE regarding the collection and treatment of urban wastewaters.
1st stage capacity: 32,820 m3/day, 105,935 PE
2nd stage capacity: 41,448 m3/day, 134,980 PE
Description of actual services provided in the assignment:
Identification of engineering design criteria’s (WWTP effluent discharge, design horizon, population growth projections, WWTP hydraulic & pollution design loads).
Evaluation of WWTP site selection, EIA regulatory requirements & geotechnical study.
Selection of WWTP general process and sludge disposal options.
Preparation of procurement plan.
Preparation of investment and project financing plan.
Evaluation of tariffs and affordability thresholds.
Analysis of total operating costs and revenues.
Analysis of the financial return on investment costs.
Controlling the financial sustainability of the Project.
Credit assessment and evaluation of EIB loan repayment plan.
Risk assessment and mitigation studies.
Gaziantep Town Various Accommodation Areas Feasibility Study, Water Supply and Sewage Network Detailed Design Work (Gaziantep Metropolitan Municipality (GASKİ)
Date: May 2014-May 2016
Location: Turkey
Work Detail:Within the scope of the work, 139 units between 0-200 persons, 95 units between 201-500 persons, 36 units between 501-1000 persons, 9 units between 1001-2000 persons, 6 units between 2001-5000 persons, 1 unit between 5001-10000 persons capacity potable water and sewerage facilities of 1 settlement were studied and their feasibility was made.
467.87 km of drinking water projects (promotion, transmission, network, etc.), 285.73 km of sewerage projects have been prepared.
Izmir Karabağlar Wastewater Treatment Plant Feasibility Report, Implementation Projects, and Environmental Impact Assessment (ÇED) Report Preparation Consultancy Service
Date: September 2023-Ongoing
Location: Turkey
Work Detail:
- Stage :24,000 m³/day MBR + 24,000 m³/day Extended Aeration Activated Sludge Hybrid System
2.Stage: Feasibility study for a wastewater treatment plant with a capacity of 96,000 m³/day MBR, preparation of implementation projects in line with the determined process based on the prepared feasibility, and preparation of the Environmental Impact Assessment (ÇED) Report for the facility
Feasibility Study and Preparation of Application Projects in Karapınar and Suğla regions of Konya province (Konya Water and Sewerage Administration – KOSKİ)
Date: September 2019-December 2020
Location: Turkey
Work Detail: The design of the infrastructure system for water supply in the Karapınar and Suğla regions of Konya province includes water transmission lines, water reservoirs, and all relevant details. It encompasses hydraulic modeling, profiles, water drainage, and air release valves. The design flow rate is 261 liters per second, serving a population of 355,043 people. By 2055, the total water transmission line length is projected to be 159,890 meters (ranging from Ø600 to Ø90), with two 100 m³ and one 200 m³ water reservoirs.
Beyşehir Group Drinking Water Supply Planning Report and Project Construction Work (DSİ)
Date:June 2018-Ongoing
Location:Turkey
Work Details: Konya Beyşehir and Derebucak districts, along with their affiliated neighborhoods, aim to determine and meet the drinking and domestic water needs of nearby settlements located on or around the route. To address potential challenges such as droughts in the water sources, water from the Derebucak Dam will be stored and delivered to the relevant residential areas.
Meriç River Industrial, Commercial and Residential Water Supply Project (State Hydraulic Works (DSİ)
Date:April 2019-Ongoing
Location:Turkey
Work Details: Organized industrial zones located around Çorlu and Çerkezköy plan to take water from the Meriç River and convey it through a 113 km transmission line to a treatment plant near Çorlu. Since meeting the industrial zones’ demand of 7.2 m³/s during July and August is not feasible solely from the Meriç River, in winter months, more than 7.2 m³/s of water will be drawn from the river. The alternatives, including constructing three new reservoirs or raising the existing dams, will be thoroughly evaluated in a planning report.